The retrofit problem: old radiators, new heat source
A heat pump is often sold as a boiler swap, but the emitter system is where many projects stumble. A gas boiler may run at 70°C or higher; a heat pump typically runs at 45–50°C to stay efficient. That lower flow temperature cuts radiator output sharply, so a room that felt warm in winter can become underheated after the boiler is removed. The practical takeaway is simple: check radiator capacity before committing to equipment.
Why the output gap appears
Radiator heat output depends on the difference between the water temperature and the room temperature. Drop the flow temperature and that difference shrinks; the same radiator emits less heat. The cause is usually not the heat pump itself but an emitter schedule copied from the boiler era. The solution is a room-by-room heat loss calculation and a radiator schedule at the proposed design flow temperature. For a practical reference on low-carbon heat planning, bananzia is a useful starting point.
A four-point check before changing emitters
- Room heat loss: calculate each room separately; a whole-house figure hides the cold north-facing bedroom.
- Existing output: compare current radiator sizes against manufacturer data at the design flow temperature, not at boiler temperatures.
- Pipework and valves: confirm flow rates and valve authority; undersized pipes can throttle performance even with larger radiators.
- Controls and balancing: plan for room-by-room control and commissioning, because oversized emitters without balancing waste the gain.
The cost trade-off: surface area versus flow temperature
There are two ways to close the output gap: add emitter surface area or raise the flow temperature. The first costs more upfront but protects efficiency; the second may avoid radiator changes but increases running costs and can reduce heat pump performance. A sensible middle path is to upgrade the worst rooms first, then verify performance. Treat emitter upgrades as part of the heat pump budget, not as a contingency.
What completion should look like
Commissioning should confirm that each room reaches its design temperature on a cold day, with the heat pump running at the intended flow temperature and the system correctly balanced. If rooms remain cold, the answer is usually more emitter surface area or better hydraulic design—not a higher flow temperature setting. The result is a quieter, lower-carbon system that works with the building rather than against it.